SMA SI 4548-US User Manual
Page 69
SMA America, LLC
8 Commissioning
Operating Manual
SI4548-6048-US-BE-en-20
69
1. Switch the DC circuit breaker of the Sunny Island to "ON".
☑ The Sunny Island initiates the start-up phase.
The notifications shown here are displayed.
The last notification is displayed as soon as the
start-up phase is completed.
2. Press and hold down
☑ The QCG is started.
– "Start System" (if you have accidentally accessed the QCG and would only like to restart
the system)
– "New System" (if you would like to start a new system or perform changes to the plant
configuration)
– "New Battery" (if you wish to reset battery-specific parameters only) You cannot change
general parameters using "New Battery".
– "Emerg Charge" (if you would like to charge a deeply discharged battery using an
external source)
3. The following parameters must be set when "New Battery" is selected:
– Device type (master, slave 1, slave 2, slave 3)
Systems with several Sunny Island inverters
If you have a system with more than one Sunny Island, you must take the following measures:
• Configure the Sunny Island with the latest firmware version as master or install the latest
firmware version in the master (see www.SMA-America.com). The master updates the
firmware of the slaves once the off-grid system is started.
• You must first run the QCG on the slave(s) before starting the master device (display
message "INIT MASTER OK START?"). Only the device type is set there. Only start the
master device thereafter!
01#StartMenu
Start System