beautypg.com

SMA SI 4548-US User Manual

Page 69

background image

SMA America, LLC

8  Commissioning

Operating Manual

SI4548-6048-US-BE-en-20

69

1. Switch the DC circuit breaker of the Sunny Island to "ON".

☑ The Sunny Island initiates the start-up phase.

The notifications shown here are displayed.
The last notification is displayed as soon as the
start-up phase is completed.

2. Press and hold down until the Sunny Island beeps three times.

☑ The QCG is started.

"Start System" (if you have accidentally accessed the QCG and would only like to restart

the system)

"New System" (if you would like to start a new system or perform changes to the plant

configuration)

"New Battery" (if you wish to reset battery-specific parameters only) You cannot change

general parameters using "New Battery".

– "Emerg Charge" (if you would like to charge a deeply discharged battery using an

external source)

3. The following parameters must be set when "New Battery" is selected:

– Device type (master, slave 1, slave 2, slave 3)

Systems with several Sunny Island inverters
If you have a system with more than one Sunny Island, you must take the following measures:

• Configure the Sunny Island with the latest firmware version as master or install the latest

firmware version in the master (see www.SMA-America.com). The master updates the
firmware of the slaves once the off-grid system is started.

• You must first run the QCG on the slave(s) before starting the master device (display

message "INIT MASTER OK START?"). Only the device type is set there. Only start the
master device thereafter!

01#StartMenu
Start System

This manual is related to the following products: