beautypg.com

16 multicluster operation, 1 communication between the sunny island inverters – SMA SI 4548-US User Manual

Page 142

background image

16  Multicluster Operation

SMA America, LLC

142

SI4548-6048-US-BE-en-20

Operating Manual

16 Multicluster Operation

16.1 Communication between the Sunny Island Inverters

For increased output, up to four Sunny Island clusters can be interconnected to form a Multicluster
system. A Multicluster Box for Sunny Island 4548-US / 5048-US / 6048-US (MCB-12U) is required
for such systems. Within each cluster, a communication interface connects the master to the slaves.
Each cluster is connected to the others via another communication interface connected to the
respective master.
The Multicluster Piggy-Back (MC-PB) is plugged into the Sunny Island at the external communication
slot. The scope of delivery of the Multicluster Piggy-Back includes a grounding cable. Lay the
grounding cable (B) as illustrated in the following figure:

Position

Description

A

Multicluster Piggy-Back (MC-PB)

B

Grounding cable connection

C

Cable route

Electrostatic Discharge
Electrostatic discharges are an acute danger to the Sunny Island and to the communication
interface.

• Ground yourself before removing the communication interface from the packaging, and

before touching any components within the Sunny Island. To achieve this, touch PE.

This manual is related to the following products: