SMA SI 4548-US User Manual
SMA Equipment
                    This manual is related to the following products:                                    
                                                                Table of contents                                                                        
                Document Outline
- 1 Information on this Document
 - 2 Sunny Island 4548-US / 6048-US
 - 3 Safety
 - 4 Mounting
 - 5 Opening and Closing
 - 6 Electrical Connection
 - 7 Control Elements
 - 8 Commissioning
 - 9 Switching On and Off
 - 10 Operation
 - 11 Data Storage on SD Memory Card
 - 12 Additional Functions
- 12.1 Load Shedding
 - 12.2 Sleep Mode
 - 12.3 Time-Controlled Operation
 - 12.4 Overload and Short-Circuit Behavior
 - 12.5 Mixed Operation with Sunny Island Inverters of Different Power
 - 12.6 Device Faults and Autostart
 - 12.7 Automatic Frequency Synchronization
 - 12.8 Time-Controlled Standby
 - 12.9 Behavior in the Event of a Failure in a Three-Phase System
 
 - 13 Battery Management
 - 14 Connecting External Sources
- 14.1 Generator
- 14.1.1 Parallel Connection
 - 14.1.2 Generator Start Options
 - 14.1.3 Generator Operation
 - 14.1.4 Manual Generator Operation
 - 14.1.5 Automatic Generator Operation
 - 14.1.6 Limits and Power Control
 - 14.1.7 Run Times
 - 14.1.8 Operation Together with PV Inverters and Wind Power Inverters
 - 14.1.9 Stopping the Generator
 - 14.1.10 Stopping the Sunny Island
 - 14.1.11 Disturbances
 
 - 14.2 Utility grid
- 14.2.1 Limits of the Voltage Range and Frequency Range
 - 14.2.2 Starting the Sunny Island
 - 14.2.3 Operation in Case of a Grid Failure in a Battery-Backup Grid
 - 14.2.4 Battery-Backup Operation and Anti-Islanding
 - 14.2.5 Grid Reconnection
 - 14.2.6 Grid Operation
 - 14.2.7 Grid Failure
 - 14.2.8 Disturbances
 - 14.2.9 Limitations and Power Control
 - 14.2.10 Operation Together with PV Inverters and Wind Power Inverters
 
 - 14.3 Generator and Utility Grid
 
 - 14.1 Generator
 - 15 Relays
 - 16 Multicluster Operation
- 16.1 Communication between the Sunny Island Inverters
 - 16.2 Commissioning the Multicluster System
 - 16.3 Switching a Multicluster System On and Off
 - 16.4 Generator Operation
 - 16.5 Behavior with Different States of Charge
 - 16.6 Testing Multicluster Communication
 - 16.7 Automatic Frequency Synchronization
 - 16.8 Firmware Update
 - 16.9 Error Handling in a Multicluster System
 - 16.10 Grid Operation
 - 16.11 Generator Emergency Operation
 
 - 17 PV Inverters
 - 18 Maintenance and Care
 - 19 Parameter Lists
 - 20 Troubleshooting
- 20.1 Error Acknowledgement
 - 20.2 Autostart Handling
 - 20.3 Master-Slave Handling
 - 20.4 Handling of Pending Errors during the Booting Procedure
 - 20.5 Display of Failures and Events
 - 20.6 Events
 - 20.7 Failure Categories
 - 20.8 Warnings and Error Messages
 - 20.9 Troubleshooting
 - 20.10 Procedure during Emergency Charge Mode
 
 - 21 Accessory
 - 22 Technical Data
 - 23 Glossary
 - 24 Compliance Information
 - 25 Contact
 

