11 setting sma optitrac global peak – SMA SB 3600SE-10 User Manual
Page 50

8.11 Setting SMA OptiTrac Global Peak
For partially shaded PV modules, you should set the interval at which the inverter is to optimize the
MPP of the PV system.
The basic procedure for changing operating parameters is explained in another section (see
Section 8.5 "Changing Operating Parameters", page 46).
Procedure:
• Select the parameter Cycle time of the OptiTrac Global Peak algorithm or
MPPShdw.CycTms and set the required time interval. The ideal time interval is usually six
minutes. This value should only be increased if the shading situation changes extremely slowly.
☑ The inverter optimizes the MPP of the PV system at the predetermined time interval.
8 Configuration
SMA Solar Technology AG
Operating Manual
SB36-50SE-BE-en-11
50
This manual is related to the following products: