10 deactivating grounding conductor monitoring – SMA SB 3600SE-10 User Manual
Page 49

Default setting:
• SB 3600SE-10: 100%
• SB 5000SE-10: 100%
Procedure:
1. Ensure that the firmware version of the inverter is at least 2.4.0.R. If necessary, carry out a
firmware update.
2. Select the parameter Fallback act power lmt P in % of WMax for absent act power lmt
and set the required percentage.
3. Select the parameter Operating mode for absent plant control and set to Use fallback
setting.
8.9 Ensuring Communication with the Purchased Electricity
Meter
Communication with the purchased electricity meter must only be ensured for a system with Sunny
Boy Smart Energy and SMA Energy Meter. If you are operating an Integrated Storage System and
have created a Sunny Home Manager system in Sunny Portal, this action will not be required.
The basic procedure for changing operating parameters is explained in another section (see
Section 8.5, page 46).
Procedure:
• Check whether the parameter Speedwire meter status is showing Ok.
If the parameter is showing Ok, the inverter has detected the purchased electricity meter and
set up communication.
If the parameter is not showing Ok, the inverter has not detected the purchased electricity
meter. The purchased electricity meter must be detected.
– Select the parameter Speedwire meter serial no. and enter the serial number of the
purchased electricity meter.
8.10 Deactivating Grounding Conductor Monitoring
If the inverter is to be installed in an IT network or another grid configuration in which deactivation
of the grounding conductor monitoring is required, deactivate the grounding conductor monitoring
as follows.
The basic procedure for changing operating parameters is explained in another section (see
Section 8.5, page 46).
Procedure:
• Set the parameter PE connection monitoring or PEOpnMon to Aus or Off.
8 Configuration
SMA Solar Technology AG
Operating Manual
49
SB36-50SE-BE-en-11