8 configuration, 1 procedure, 2 changing the display language – SMA SB 3600SE-10 User Manual
Page 44: Configuration, Procedure, Changing the display language

8 Configuration
8.1 Procedure
Once you have commissioned the inverter, you may have to adjust various settings via the rotary
switches in the inverter or via a communication product. This section describes the procedure for
configuration and gives an overview of the steps you must perform in the prescribed order.
Procedure
See
1. If the display language is not set correctly, adjust the set-
tings.
2. Integrate the inverter into the network.
3. To monitor the PV system and visualize PV system data,
create a Sunny Portal system.
4. To enable configuration of inverter operating parameters,
download Sunny Explorer with minimum software version
1.07 to your computer and create the system in Sunny Ex-
plorer, or add the inverter to an existing system.
Manual of the Sunny Explorer at
5. Set the PV system password and PV system time with
Sunny Explorer or Sunny Portal.
Manual of the respective commu-
nication product at
Solar.com
6. If it is likely that the battery cannot be charged for a cer-
tain time during the year, e.g., in winter due to snow-cov-
ered PV modules, set the lower battery charge limit.
7. Set the active power limit at the grid-connection point.
8. Set the active power limitation in case of PV system control
failure.
9. Ensure that there is communication with the purchased
electricity meter.
10. If necessary, deactivate grounding conductor monitoring.
11. For partially shaded PV modules and depending on the
given shading situation, you should set the interval at
which the inverter optimizes the MPP of the PV system.
8.2 Changing the Display Language
If the language for the country data set is not the language you want to use, you can change the
display language as follows:
8 Configuration
SMA Solar Technology AG
Operating Manual
SB36-50SE-BE-en-11
44