3 commissioning the inverter, Commissioning the inverter – SMA SB 3600SE-10 User Manual

Page 40

background image

Procedure:

1. Determine the rotary switch position for your country and purpose. To do this, consult the

Technical Information "Overview of the Rotary Switch Settings" at www.SMA-Solar.com.

2.

Danger to life due to high voltages

• Ensure that the inverter is disconnected from all voltage sources and that the enclosure lid

is removed (see Section 10, page 54).

3. Set the rotary switches A and B to the required

position using a flat-blade screwdriver (blade
width: 2.5 mm).

☑ The inverter will adopt the setting after commissioning. This can take up to five minutes.

7.3 Commissioning the Inverter

Requirements:

☐ The inverter and the Battery Pack must be correctly mounted.
☐ The circuit breaker must be correctly rated.
☐ All cables must be completely and correctly connected.
☐ Unused DC inputs must be sealed using the corresponding DC connectors and sealing plugs.
☐ The country data set must be set correctly for the country or the purpose.
☐ The Battery Pack must have been pushed as far as possible to the right on the wall mounting

bracket and the protective cover must be over the Battery Pack.

☐ The inverter must be connected to the network.
☐ The inverter must be connected to the SMA Energy Meter or to another suitable energy meter.

Procedure:

1. Ensure that the DC load-break switch is turned to position OFF. This makes it possible to fit the

enclosure lid to the enclosure.

2. Attach the enclosure lid as follows:

7 Commissioning

SMA Solar Technology AG

Operating Manual

SB36-50SE-BE-en-11

40