beautypg.com

2 machine switch-on – HEIDENHAIN TNC 128 (77184x-01) User Manual

Page 37

background image

HEIDENHAIN TNC 128

37

1

.2

M

a

ch

in

e

s

w

it

ch

-o

n

1.2 Machine switch-on

Acknowledging the power interruption and
moving to the reference points

Switch on the power supply for control and machine. The TNC
starts the operating system. This process may take several
minutes. Then the TNC will display the message "Power
interrupted" in the screen header

Press the CE key: The TNC compiles the PLC

program

Switch on the control voltage: The TNC checks

operation of the emergency stop circuit and goes into
the reference run mode

Cross the reference points manually in the displayed

sequence: For each axis press the machine START
button. If you have absolute linear and angle encoders
on your machine there is no need for a reference run

The TNC is now ready for operation in the Manual Operation mode.

Further information on this topic

Traversing the reference marks: See "Switch-on" on page 276

Operating modes: See "Programming and Editing" on page 61

Switch-on and crossing the reference points can vary
depending on the machine tool. Your machine manual
provides more detailed information.