Completing the installation, Completing the installation of a new system, Completing the installation -29 – Enterasys Networks Enterasys Matrix 6H303-48 User Manual
Page 61: Completing the installation of a new system -29

Completing the Installation
Matrix DFE-Gold Series Installation Guide 3-29
Completing the Installation
Completion of the DFE module installation depends upon the type of system in which the
module is being installed.
•
If installing in a new DFE module system, refer to “
•
If installing in an established, operating DFE module system, refer to “
Installation of a DFE‐Gold Module in an Existing System
Completing the Installation of a New System
In a new system of DFE modules, one of the installed DFE modules will become the
management module on chassis power up, and all DFE modules will automatically be set
to the factory default values. A complete list of the factory default values are provided in
Chapter 3 of the Matrix DFE‐Gold Series Configuration Guide.
After installing all DFE‐Gold modules into the host chassis and making the connections to
the network, proceed to the following
First‐Time Log‐In Using a Console Port Connection
procedure to access the module management startup screen from your PC, terminal, or
modem connection.
Modem Port Adapter Wiring and Signal Diagram
RJ45
DB25
Pin
Conductor
Pin
Signal
1
Blue
2
Transmit (TX)
2
Orange
8
Data Carrier Detect (DCD)
4
Red
3
Receive
5
Green 7
Ground
(GRD)
6
Yellow
20
Data Terminal Ready (DTR)
8
Gray
22
Ring Indicator
RJ45 Connector (Female)
8
1
Pins
DB25 Connector (Male)
13
1
Pins
14
25