Unpacking the dfe-gold module, Table 3-1 contents of dfe-gold module carton, Installing optional network expansion modules – Enterasys Networks Enterasys Matrix 6H303-48 User Manual
Page 34: Contents of dfe-gold module carton -2
Unpacking the DFE-Gold Module
3-2 Installation
Unpacking the DFE-Gold Module
Unpack the DFE‐Gold module as follows:
1.
Open the box and remove the packing material protecting the DFE‐Gold module.
2.
Verify the contents of the carton as listed in
.
3.
Remove the tape seal on the non‐conductive bag to remove the DFE module.
4.
Perform a visual inspection of the DFE‐Gold module for any signs of physical
damage. Contact Enterasys Networks if there are any signs of damage. Refer to
“
” on page 1‐8 for details.
Installing Optional Network Expansion Modules
Installing a network expansion module involves
•
removing the coverplate from the DFE‐Gold module,
•
attaching the network expansion module to the DFE‐Gold module, and
•
if required, installing the Mini‐GBICs.
For information about...
Refer to page...
Table 3-1 Contents of DFE-Gold Module Carton
Item
Quantity
DFE-Gold module (4G4202-72
or
4G4282-49) 1
This Installation Guide
1
Customer Release Notes
1
Note: Install any optional equipment before proceeding to “
on page 3-9 for an explanation of the rules to install different series modules in a Matrix E7
chassis.
Caution: An antistatic wrist strap is required to perform the following procedures to
minimize ESD damage to the devices involved.
Precaución: Para minimizar los efectos de las descargas de electricidad estática, deberá
utilizar una pulsera antiestática al realizar los siguiente procedimientos.