beautypg.com

Unpacking the dfe-gold module, Table 3-1 contents of dfe-gold module carton, Installing optional network expansion modules – Enterasys Networks Enterasys Matrix 6H303-48 User Manual

Page 34: Contents of dfe-gold module carton -2

background image

Unpacking the DFE-Gold Module

3-2 Installation

Unpacking the DFE-Gold Module

Unpack the DFE‐Gold module as follows:

1.

Open the box and remove the packing material protecting the DFE‐Gold module.

2.

Verify the contents of the carton as listed in 

Table 3‐1

.

3.

Remove the tape seal on the non‐conductive bag to remove the DFE module.

4.

Perform a visual inspection of the DFE‐Gold module for any signs of physical 
damage. Contact Enterasys Networks if there are any signs of damage. Refer to 

Getting Help

” on page 1‐8 for details.

Installing Optional Network Expansion Modules

Installing a network expansion module involves 

removing the coverplate from the DFE‐Gold module,

attaching the network expansion module to the DFE‐Gold module, and 

if required, installing the Mini‐GBICs.

Completing the Installation

3-29

For information about...

Refer to page...

Table 3-1 Contents of DFE-Gold Module Carton

Item

Quantity

DFE-Gold module (4G4202-72

 or 

4G4282-49) 1

This Installation Guide

1

Customer Release Notes

1

Note: Install any optional equipment before proceeding to “

Module Placement and Rules

on page 3-9 for an explanation of the rules to install different series modules in a Matrix E7
chassis.

Caution: An antistatic wrist strap is required to perform the following procedures to
minimize ESD damage to the devices involved.

Precaución: Para minimizar los efectos de las descargas de electricidad estática, deberá
utilizar una pulsera antiestática al realizar los siguiente procedimientos.