Order of setup, 2 s o ft wa re s e tu p – HEIDENHAIN ND 100 User Manual User Manual
Page 69

ND 120 QUADRA-CHEK
69
2
.2
S
o
ft
wa
re
s
e
tu
p
Order of setup
The setup software is contained on up to 18 screens, depending on
the hardware configuration. It is possible that not all the setup screens
described in this chapter are active in your system. Disregard screen
descriptions that do not apply to your DRO.
The initial setup tasks should be performed in the order listed here.
Instructions are presented in this order on subsequent pages.
The additional setup tasks can be performed in any order.
Setup configurations can be saved to a computer using USB-to-Serial
connection.
Initial setup tasks
Setup screens
1: Language selection, axis configuration and product version information
About
2: Supervisor password entry
Supervisor
3: Encoder configuration
Encoders and Misc
4: Loading settings data (instead of manual setup)
Supervisor
5: Stage squareness calibration
Squareness
6: Error correction
LEC, SLEC or NLEC screen
7: Measurement scaling for parts that expand or shrink
Scale factor
8: Measurement configuration
Measure
9: Display formatting
Display
Remaining setup tasks
Setup screens
Hot key assignments
Hot keys
Print formatting
Print and Form characters screens
Saving settings
Setup screens
Saving settings data
Supervisor