beautypg.com

Order of setup, 2 s o ft wa re s e tu p – HEIDENHAIN ND 100 User Manual User Manual

Page 69

background image

ND 120 QUADRA-CHEK

69

2

.2

S

o

ft

wa

re

s

e

tu

p

Order of setup

The setup software is contained on up to 18 screens, depending on
the hardware configuration. It is possible that not all the setup screens
described in this chapter are active in your system. Disregard screen
descriptions that do not apply to your DRO.

The initial setup tasks should be performed in the order listed here.
Instructions are presented in this order on subsequent pages.

The additional setup tasks can be performed in any order.

Setup configurations can be saved to a computer using USB-to-Serial
connection.

Initial setup tasks

Setup screens

1: Language selection, axis configuration and product version information

About

2: Supervisor password entry

Supervisor

3: Encoder configuration

Encoders and Misc

4: Loading settings data (instead of manual setup)

Supervisor

5: Stage squareness calibration

Squareness

6: Error correction

LEC, SLEC or NLEC screen

7: Measurement scaling for parts that expand or shrink

Scale factor

8: Measurement configuration

Measure

9: Display formatting

Display

Remaining setup tasks

Setup screens

Hot key assignments

Hot keys

Print formatting

Print and Form characters screens

Saving settings

Setup screens

Saving settings data

Supervisor