beautypg.com

Installation – Hypertherm HD3070 Plasma Arc Cutting System w/ Automatic Gas Console User Manual

Page 81

background image

HD3070 with Automatic Gas Console

Instruction Manual

3-33

16

INSTALLATION

Control Cable
4X1

Preflow Gas Hose
(Red Band)

Shield Gas Hose
(Green Band)

Plasma Gas Hose
(Blue Band)

Control Cable
3X3

Preflow Gas Hose
(Red Band)

Plasma Gas Hose
(Blue Band)

Automatic Gas Console

Shield Gas Hose
(Green Band)

Off-Valve Assembly

Gas Lead Set

Figure 3-25 Gas Console to Off-Valve Assembly Interconnections

*Disregard these items, if system was ordered without the blow

back option.

Off-Valve Cable

*Blow Back Solenoid

(End user 120 VAC required.)

SV16

SV14

SV15

Plasma Hose
Figs 3-24 & 3-28

Shield Hose
Figs 3-24 & 3-27

*Blow Back Hose

Figure 3-24

SV16

SV15

SV14

14B

14C

14B

14A 14B

14C

14C

14B

14C

14D

14D

14D

14A

14D

14A

14A

14

15

16

17

Part Number

Length

128175

15 ft (4.6 m)

128176

20 ft (6.1 m)

128177

25 ft (7.6 m)

128178

30 ft (9.1 m)

128179

35 ft (10.6 m)

128180

40 ft (12.2 m)

128181

50 ft (15.2 m)

128182

75 ft (23 m)

128183

100 ft (30.5 m)