Installation – Hypertherm HD3070 Plasma Arc Cutting System w/ Automatic Gas Console User Manual
Page 79
GREEN
GREEN
RED
RED
HD3070 with Automatic Gas Console
Instruction Manual
3-31
16
INSTALLATION
Cooling Return Hose
(Red Band)
Pilot Arc Lead (+)
Pilot Arc Lead (+)
Blow Back
Hose (installed)
Figure 3-25
Torch Lead Set
Cooling Return Hose (Red
Band not shown this end)
RHF Console
45° Quick
Disconnect
CAUTION
Hold hex fittings on quick
disconnect. Do not turn.
Tubing may snap. To
install and remove hoses
and leads, turn fittings on
hoses and leads only.
CAUTION
Remove the foam block used to support the
cathode block during shipment in order to make
the cooling water return hose connections.
Shield Hose
Figs 3-25
& 3-27
Torch Lead Set
with blow back option (shown)
Part Number
Length
028866
15 ft (4.6 m)
028867
20 ft (6.1 m)
028868
25 ft (7.6 m)
028869
30 ft (9.1 m)
028695
35 ft (10.6 m)
028870
40 ft (12.2 m)
128001
50 ft (15.2 m)
128083
75 ft (23 m)
128084
100 ft (30.5 m)
Figure 3-24
RHF Console to Torch Quick Disconnect Interconnections
Cooling Return
Hose (Red Band)
Pilot Arc Lead (+)
Cooling Supply
Hose/Power Lead (-)
(Green Band)
Part Number
Length
028498
15 ft (4.6 m)
028499
20 ft (6.1 m)
028500
25 ft (7.6 m)
028501
30 ft (9.1 m)
028502
35 ft (10.6 m)
028503
40 ft (12.2 m)
128132
50 ft (15.2 m)
128133
75 ft (23 m)
128134
100 ft (30.5 m)
Torch Lead Set
without blow back option (not shown)
Straight Quick
Disconnect
Plasma Hose
Figs 3-25
& 3-28
Torch Vent
Hose
Shield Hose
Figs 3-25
& 3-27
Torch Vent
Hose
Plasma Hose
Figs 3-25
& 3-28
Cooling Supply Hose/
Power Lead (-)
(Green Band)
Cooling Supply Hose/
Power Lead (-)
(Green Band)
13B
13B
13B
13B
13B
13C
13C
13C
13C
13C
13A
13A
13A
13A
13A
16
15
13
13
16
17
17