Gasboy 1000 Series FMS Startup Manual User Manual
Page 7

GASBOY Series 1000
1-2
03/07/03
START-UP OVERVIEW
Start-up for the Series 1000 System consists of:
•
verifying the system layout
•
making sure the system complies with the guidelines and restrictions outlined in the system
Installation Guide and this manual.
•
testing the system
•
helping the system user execute the commands needed to start the system
•
making sure the customer understands how the system works
•
filling out the GASBOY Series 1000 Start-up Form, 55F065
WHAT YOU NEED FOR TESTING
To perform the testing portion of start-up, you will need:
•
a digital voltmeter
•
a 1/4 inch flat blade screwdriver
•
a Phillips head #1 screwdriver
•
a Phillips head #2 screwdriver
•
a plastic 1/8 inch or smaller flat blade screwdriver
•
a tape measure
We recommend that you bring all your tools and spare parts when doing a start-up.
FILLING OUT THE START-UP FORM
A sample filled-out Start-Up form appears at the end of this manual. You should already have
blank copies of the Start-up form; however, if you do not, you can obtain more by calling GASBOY
Office Services Department. Throughout the procedures in this manual, you will find double-
outlined boxes preceded by this symbol
✍
. This writing hand symbol tells you to "fill in" the
start-up information for the entries contained in the box.
When you encounter a box, fill in all the information requested. If an option is not used or does
not apply, fill in N/A (not applicable) in that space. It may be helpful to have the terminal operator
review the Series 1000 Operation Manual, if he has not already done so, while you are starting up
the system.
The Start-Up Form must be filled out completely and sent to:
Gasboy International LLC
Customer Service Dept.
707 N. Valley Forge Rd.
P.O. Box 309
Lansdale, Pa 19446