Finish start-up – Gasboy 1000 Series FMS Startup Manual User Manual
Page 54

03/07/03
13-1
Section 13
FINISH START-UP
1.
Unlock and lower the rear door of the Series 1000 head assembly.
2. Move the Pulse Rate switch (located on backside of the microprocessor and accessed
through a hole in the sheet metal) towards the front of the unit.
3.
Close and lock the rear door.
✍
At the top of page 2, after Customer:, write the customer’s name. This is used as a reference in
case the two forms become separated.
10. CUSTOMER KNOWLEDGE
Briefly describe the customer’s understanding of the Series 1000 system.
11. PARTS USED
Fill in the Source of Parts Used section. Write down any parts used in the start-up of the system.
Include the serial numbers of old and new parts and why the part was changed.
12. SITE LAYOUT
Sketch a layout of the site. Be sure to include the location of the system, hose outlets, data
terminals, external modems, circuit breakers and wiring distances.
4. Generate a printout showing transactions with quantity, pump fuel assignments, limitation
codes, authorization codes, and pulse rates/timeouts. Use the commands PT, PP, PL, PF,
and XP). Include this printout with the Start-up form.
5.
Turn over the keys for the system (and test cards or data keys) to the person in charge of the
site.
✉
Make a copy of the Start-up form for your records and send the form and the printout from Step 4
above to:
GASBOY
Technical
Service
Department
707 N. Valley Forge Rd.
P.O.
Box
309
Lansdale, Pa 19446