Page 22: Connection
Commissioning
Operating Manual PNOZ m1p (ETH)
20878-EN-12
22
Download modified project to the control system PNOZmulti
Load modified project from chip card
To download data via chip card, the existing configuration data must first be deleted (gener-
al reset of device).
Procedure:
}
Switch off the supply voltage.
}
Disconnect all the output terminals.
}
Jumper OA0-I19 on the base unit.
}
Switch on the supply voltage.
When the "DIAG" LED on the base unit flashes, the memory has been cleared. The project
data can now be downloaded:
}
Switch off the supply voltage.
}
Remove the old chip card from the chip card slot on the base unit.
}
Remove the jumper from OA0-I19 on the base unit.
}
Insert the chip card containing the current project into the card slot.
}
Switch on the supply voltage.
Load modified project via integrated interface
Proceed as described for the initial commissioning
Connection
Supply voltage
AC
DC
For the safety system
(connector X7)
A1
+ 24 V DC
A2
0 V
For the semiconductor outputs
(connector X2)
Must always be present, even if
the semiconductor outputs are not
used
24 V
+ 24 V DC
0 V
0 V
Supply voltage
6.3.3
6.3.3.1
6.3.3.2
6.3.4