Appendix b - probe deployment – Hanna Instruments HI 9829 User Manual
Page 84

84
General Guidelines for fixed installation
General Guidelines for fixed installation
General Guidelines for fixed installation
General Guidelines for fixed installation
General Guidelines for fixed installation:
• Select a water-sampling site that will allow collection of representative water
samples.
• Position the probe so the sensor surfaces face toward the flow. This will
minimize air bubble or fluid cavitation. Limit flow rate to moderate
• Mount Probe 0 to 45° angle from vertical to avoid sensors (pH, pH/ORP,
ISE) from becoming electrically discontinuous due to internal electrolytes
flowing away from their internal cells.
• Install meter or probe where they will be accessible for maintenance as
required.
• Regularly visit water sampling sites to: check for damage to sensors, the
installation mountings, and the probe/meter battery power.
• Remove aquatic weed growth that may be interfering with water sample
collection.
• Set up devices and programs for water monitoring and sampling.
• If the probe is suspended from a pier or bridge ensure that it is protected
from debris by positioning behind a support and anchoring the cable /probe
to a pipe.
• Have access to spare sensors and proper range standard solutions or
buffers.
• Strictly follow the established SOP’s.
• Download data to a laptop computer or meter on site.
• Protect probe and sensors from excessive sunlight.
• Flow cell installation; Avoid trapped air. Maintain constant flow rate.
APPENDIX B - PROBE DEPLOYMENT