Reznor ADFH Option - Installation - Roof Curbs Assembly User Manual

Page 37

background image

Form I-OPT-C, P/N 132900 R17, Page 37

Installation Instructions for Cabinet Sizes 1 & 2 Horizontal Curb, Option CJ48 and Option CJ55

1. Refer to FIGURE 14B shown on page 36 and position

the two curb ends

(Item A) and four side pieces (Items

B, C, D, E). Verify the side pieces are positioned cor-

rectly (shorter piece at the inlet air end and longer

piece at the control end of the unit).

2. Attach Curb Corners. Using the hardware provided

(lag screw and washer in top holes; cap screw, washer,

and nut in the 4 holes below the wood nailer), create

the four corners by attaching the ends to the side

pieces.

3. Attach the two Side Splice Plates (Item F). Use the

hardware provided (lag screw and washer in top holes;

cap screw, washer, and nut in the 4 holes below the

wood nailer) to attach splice plates (

Item F) joining the

side pieces (

Items B&D and Items C&E) to complete

the perimeter of the curb.

4. Attach the Two Outer Plenum Side Panels (Item G).

Position each insulated panel with the wide bottom

flange toward the center. Align the panel with the holes

in the curb sides and attach with sheetmetal screws.

5. Install the Plenum Duct Bottom Panel (Item H).

Lower the insulated bottom panel into the curb, resting

it on the flanges of the two panels installed in Step 4.

Attach the bottom panel with sheetmetal screws.

6. Install the Two Inner Plenum Side Panels (Item J).

Position one insulated side panel as illustrated and

align the holes. Attach with sheetmetal screws to sides

and bottom. Repeat to install the other side panel.

7. Install Baffle in the Supply Air Plenum (Item K).

Position the baffle between the insulated side panels

(

Items G&J) as illustrated and align the holes. Attach

with sheetmetal screws.

8. Attach the Duct Flanges (Items L & M). Using sheet-

metal screws, attach the duct flange

(Item L) around

the supply opening and the smaller duct flange (

Item

M) around the return air opening. If the installation

does not have return air, attach a field-fabricated cover

over the return air opening.

9. Check the Squareness, Level the Curb, and Install

the Flashing (reference Figure 13E on page 34

for flashing information).

Adjust the curb so that the

diagonal measurements are equal within a tolerance of

±1/8”(3mm).
To ensure a good weatherproof seal between the

cabinet curb cap and the perimeter of the curb, the

curb must be leveled in both directions with no twist

end to end. Shim as required and secure the curb to

the roof deck.
Install field-supplied flashing.

10. Before placing the unit on the curb, apply 1/4” x

1-1/4” foam sealant tape to both the top surface of the

curb rails and the top surface of the duct sides.

IMPORTANT: Verify that the unit will be placed in the

correct airflow orientation to mate properly with the

discharge and return air openings.