Figure 4g - curb detail, Unit with an energy recovery module – Reznor ADFH Option - Installation - Roof Curbs Assembly User Manual
Page 13

Form I-OPT-C, P/N 132900 R17, Page 13
Y
Z
(Return
Air
Cap)
A
B
B
C
G1
G2
M
B
G2
M
N
G1
R
U
U
W
S
S
R
X
3/4” Hex Head Cap Screws with
Lockwashers and Hex Nuts (8 per corner)
2” Lag Screw and
Lockwasher (2 per corner)
Corner Hardware
for attaching “Y”:
F
(Insulation up)
3 Y’s
FIGURE 4F - Install
the Curb End with
Duct Connections
(
3
Y'S
) and the
Energy Recovery
Section Duct Top (
Z
)
Counter
Flashing
(by installer;
install after
curb assembly)
Insulation
2 x 4 Wood
Nailer
Cabinet
Cant Strip
(by installer)
Weld, bolt,
or lag screw
curb to deck
structure.
FIGURE 4G -
Curb Detail
Dimensions (inches/mm)
FIGURE 4H - Weights and Dimensions of Options CJ54 & CJ53 for MAPS
®
Unit with an Energy
Recovery Module
Supply
Duct
Supply
Duct
X
Y
Roof Curb Option CJ53 & CJ54
for MAPS with Option ER1
Energy Recovery Module
TOP VIEW
Roof Curb Option CJ53 & CJ54
for MAPS with Option ER1
Energy Recovery Module
SIDE VIEW
Return Air Duct
R
S
T
U
R
V
W
10-3/16
(259)
NOTE: Top duct liner is one piece
(illustrated) on Cabinet A. Cabinets B
and C have a two-piece top duct liner.
(MAPS Unit)
(Energy Recovery Unit)
Cabinet
R
S
T
U
V W
X
Y
A*
inches
15
2-5/16 34-13/16 38-5/8 18 32
133 136-3/4
mm
381
59
884
981 457 813 3378
3473
B*
inches
22-1/2 2-5/16 49-13/16 53-5/8 18 32
133 136-3/4
mm
572
59
1265
1362 457 813 3378
3473
C*
inches
28-1/4 2-5/8 61-5/16 65-1/8 22 36 167-7/8 171-5/8
mm
718
67
1557
1654 559 914 4264
4359
*See Model Size / Cabinet Size Cross Reference on
page 2.
Cabinet
Size *
A
B
C
Opt CJ54 Opt CJ4 Opt CJ53
lbs
675
785
1087
kg
306
356
493
Roof Curb Weight
9. Complete field installation of the roof curb
a) Check the assembly for squareness. The curb must be adjusted so that the
diagonal measurements are equal within a tolerance of ±1/8” (±3mm).
b) Level the roof curb. To ensure a good weatherproof seal between the unit curb
cap and the roof curb, the roof curb must be leveled in both directions with no
twist end to end. Shim as required and secure curb to roof deck.
c) Install field-supplied flashing (FIGURE 4G).
d) Apply 1/4" x 1-1/4" foam sealant tape to both the top surface of the curb rails
and the top surface of the perimeter of the duct dividers, being sure to make
good butt joints at all corners.
10. Lift the MAPS
®
unit on to the prepared curb (See Rigging and Lifting in the unit
installation manual, Form I-MAPSIII&IV).
IMPORTANT: Verify that the unit will be
placed in
the correct airflow orientation to mate properly with the discharge
and return air openings. Remember that the energy recovery module is at the
discharge end of the curb.
11. After the MAPS
®
unit is in place, follow the instructions shipped with the energy
recovery module (Form I-MAPSIII&IV-ER) to lift and mate the energy recovery
module to the MAPS
®
unit.
12. Refer to the MAPS
®
installation manual and start up information to complete the
installation.
ID
P/N by Cabinet Size
Y
A-261656 B-261657
C-261672
A-261386 B-261387
C-261414
A-261388 B-261389
C-261415
Z A-262545 B-262552
&262556
C-261676
&262435
NOTE: Cabinet
Sizes B and C -
Insulated Duct Top
(Code Z) is two
piece
- RCB Option - Installation - Roof Curbs Assembly RDB Option - Installation - Roof Curbs Assembly RDC Option - Installation - Roof Curbs Assembly RDCB Option - Installation - Roof Curbs Assembly RDCC Option - Installation - Roof Curbs Assembly RDDB Option - Installation - Roof Curbs Assembly RCC Option - Installation - Roof Curbs Assembly RDDC Option - Installation - Roof Curbs Assembly RECB Option - Installation - Roof Curbs Assembly RECC Option - Installation - Roof Curbs Assembly REDB Option - Installation - Roof Curbs Assembly REDC Option - Installation - Roof Curbs Assembly RDF Option - Installation - Roof Curbs Assembly RDH Option - Installation - Roof Curbs Assembly REH Option - Installation - Roof Curbs Assembly RHH Option - Installation - Roof Curbs Assembly RXH Option - Installation - Roof Curbs Assembly RPB Option - Installation - Roof Curbs Assembly RPBL Option - Installation - Roof Curbs Assembly RPDBL Option - Installation - Roof Curbs Assembly YDSA Option - Installation - Roof Curbs Assembly YDMA Option - Installation - Roof Curbs Assembly YDHA Option - Installation - Roof Curbs Assembly RBL Option - Installation - Roof Curbs Assembly ADF Option - Installation - Roof Curbs Assembly