Installation standard manual – Yamato Scientific SQ 510 Autoclave, Sterilizers User Manual
Page 60

57
Installation Standard Manual
* Install the unit according the procedure described below (check options and special specifications separately).
Model Serial
number Date
Person in charge of installation
(company name)
Person in charge of
installation
Judgment
№
Item
Method
Reference operation manual
Judgment
Specifications
1 Accessories
Check the quantities of accessories with the
quantities shown in the Accessory column.
Specification
P.49
・
Visually check the surrounding area.
Note: Pay attention to the ambient
environment.
・
Keep space.
Before Using This Unit
"1. Choose a proper place for
installation
P.6
Before Using This Unit
"7. Choose a correct power
distribution board or receptacle"
P.8
Before Using This Unit
"9. Always ground this unit"
P.9
・
Measure the customer-specific voltage
(switchboard and outlet) with the tester.
・
Measure the voltage at operation (it must be
within the range of standard).
Note: Use the on-spec product when
installed on the plug or breaker.
Specification
P.49
・
Clean the packing and flange on the
chamber.
Handling Precautions
"Do not damage the packing on
the cover or flange on the
chamber"
P.
42
・
Attach the drain bottle.
Note: Supply water into the bottle.
・
Attach the drainboard.
・
Close the drain valve.
・
Supply water into the chamber.
Note: Supply water to the gauge level on
the drainboard.
2 Installation
・
Attach the vapor cup and droplet tray.
Before Using This Unit
"Installation Procedure"
P.10
Operation
1 Test
operation
・
Start operation.
Operate the equipment with the apparatus
sterilization course.
Check: pressure/temperature rise,
Vapor leak is not allowed.
Operation Method
"Apparatus/Liquid Sterilization
Course"
P.
27
Description
1
Description of
operation
Explain the operation of each unit to the
customer according to this Operation Manual.
All
2 Error
code
Explain error codes and the procedure for
resetting them to the customer according to
this Operation Manual.
In the Event of Failure…
P.45
Maintenance Method
P.43
3
Maintenance
inspection
Explain the operation of each unit to the
customer according to this Operation Manual. Periodical Inspection
P.58
4
Completion of
installation
Information to
be entered
・
Enter the date of installation and the name
of the person in charge of installation on
the face plate on the unit.
・
Enter necessary information on the
guarantee, and pass it to the customer.
・
Explain the after-sale service route to the
customer.
After Service and Warranty
P. 48