beautypg.com

Maintenance/service – MacDon 742 HAY CONDITIONER User Manual

Page 79

background image

Form # 46290

Issue 09/05

77

MAINTENANCE/SERVICE

MAINTENANCE SCHEDULE

The following maintenance schedule is a listing of periodic maintenance procedures, organized by service

intervals. For detailed instruction, see the specific headings in Maintenance/Service section. Use

"Recommended Lubricants" as specified under that heading.

SERVICE INTERVALS

The recommended service intervals are in hours of operation. Use the hour meter in the windrower or

combine cab to indicate when the next service interval has been reached.

IMPORTANT: Recommended intervals are for average conditions. Service header more often if operated

under adverse conditions (severe dust, extra heavy loads, etc.)

Regular maintenance is the best insurance against early wear and untimely breakdowns. Following this

schedule will increase machine life.

Where a service interval is given in more than one time frame, e.g. "100 Hours or Annually", service the

header at whichever interval is reached first.

CAUTION: Carefully follow safety messages given under "Service Procedures".

AT FIRST USE: See "Break-In Period" in Operation section.

10 HOURS OR DAILY

1. Grease secondary driveline (combine

applications)

2. Check hydraulic hoses, lines and

components for leaks

3. Oil sickle (except in sandy conditions)

4. Check sickle sections, guards and hold-downs

5. Oil hay conditioner drive chain

6. Check gauge wheel tire pressure.

25 HOURS

1. Grease sickle head

50 HOURS

1. Grease cross shaft center supports (double sickle.)

2. Grease reel support bushings (R/H end of split

pick-up reel header)

3. Grease hay conditioner roll bearings

4. Grease hay conditioner belt idler pulley

bearings.

100 HOURS OR ANNUALLY *

1. Grease draper roller bearings

2. Grease reel drive support bearings

3. Grease pick-up reel drive cam

4. Grease reel tail support bearing

5. Grease split reel connector block

6. Grease sickle drive shaft support bearings

7. Grease cross shaft support bearings (double sickle)

8. Grease upper cross auger support bearing

(option)

9. Grease gauge wheel pivot bushings (option)

10. Grease gauge roller bearings (option)

11. Check sickle drive belt tension

12. Check wobble box mounting bolts

13. Check wobble box lubricant level

14. Check reel drive chain tension

15. Grease reel drive chain

16. Check hay conditioner drive chain tension

17. Check gauge wheel bolt torque.

500 HOURS OR ANNUALLY *

1. Grease gauge wheel hub bearings (option)


END OF SEASON: See "Storage Procedure" in Operation section.

1000 HOURS OR 3 YEARS

1. Change wobble box lubricant.

* It is recommended that Annual Maintenance be done prior to start of operating season.

This manual is related to the following products: