beautypg.com

Unloading & assembly – MacDon 742 HAY CONDITIONER User Manual

Page 113

background image

Form # 46290

Issue 09/05

111

M

N

P

REPLACE Z-PLATE WITH FLAT:

9352/4952/2952/8152

Q

S

UNLOADING & ASSEMBLY

PREPARE TRACTOR FOR HAY CONDITIONER

1. Attach conditioner float spring support (H) to

tractor left floorboard using three 1/2 x 1-1/4

carriage bolts, flatwashers, lockwashers and

nuts.

NOTE: If rear hole in support (H) does not line

up with an existing hole in tractor floorboard,

attach support at front two holes and drill a

17/32 hole through floorboard using rear hole

in support as a guide.

Connect float spring to support using 5/8 x 4-1/2

thread full length hex bolt and nut. Tighten to

attain a 1/4 inch (6 mm) gap from nut (J) to

support (H) when nut is locked against spring

insert.

3. Block tractor lift linkage to support weight of

R/H lift linkage. Remove retaining bolt on

existing pin and tap in new pin, removing old

pin at the same time. Re-install retaining bolt

through pin.

NOTE: Ensure hole in pin will be located on

onboard side of tractor leg.

For high clearance models (MacDon/Westward 9352, Prairie Star 4952, Premier 2952. Harvest Pro 8152):

1. Replace Z-shaped float spring support (H)

shown above with plate (M). Turn draw bolt
so that thread showing at (N) is 1-1/4” (32
mm) and tighten nut against spring plug at
(P). Mount spring in hole (Q) for tractors
equipped with shallow angle kit, and hole (S)
for tractors without shallow angle kit.
NOTE: For lighter conditioner float, decrease
dimension (N). For heavier float, increase
(N).

ATTACH FLOAT SPRING & SUPPORT

H

REMOVING RETAINING PIN

This manual is related to the following products: