beautypg.com

Unloading & assembly – MacDon 742 HAY CONDITIONER User Manual

Page 103

background image

Form # 46290

Issue 09/05

101

UNLOADING & ASSEMBLY


REEL SUPPORT ARMS – 12’ to 25’ Headers

1. Drive forklift to front of header, near center. Place

a lifting strap around reel main tube and attach to
forklift.

NOTE: To avoid damage to tube, do not lift with
forks directly under reel tube.


2. Remove nuts (A) securing yellow shipping

supports to reel support arms, both ends of
header. For 25’ headers only, remove yellow reel
tube support (D) and angle (E) at center of
header. Remove metal banding from reel.


3. Raise the forks slowly to raise reel. Engage reel

props and lower forks until reel rests on props.
Back the forklift away.











4. Cut shipping wire securing reel lift cylinders.

Attach rod end of reel lift cylinder to header at
(B) with pins provided.


5. Remove the bolts securing shipping supports to

header frame. Discard straps and re-install
hardware. Hardware at (F) is installed reversed
for ease of access when removing shipping
supports. To prevent damage to reel end shields
and /or discs, always install carriage head bolts to
the inside of header as shown for field use.


REEL SUPPORT ARMS SHIPPING POSITION

A

REEL SUPPORT ARMS WORKING POSITION

B

REMOVE CENTER REEL SUPPORT

25’ HEADERS

D

E

INSTALL HARDWARE WITH HEADS IN

F

This manual is related to the following products: