FIGURE 10
Use a square to ensure that the Crossbars
are exactly perpendicular to the Main Side
Hoops, and that the Main Side Hoops are
perpendicular to the Jeep’s floor. Use a dead
blow hammer to gently tap the components
into adjustment. Work your away around the
assembly a couple of times, as adjustments
you make at one end may affect the placement
at the other. During this procedure, ensure
that the ratchet straps stay tight and Main
Side Hoops remain firmly seated into the
laser-cut notches of the Crossbars.
FIGURE 10
12. Tack-weld the cage at each joint of the
assembly so far. These tack welds should be
big enough to temporarily hold the assembly
together, but small enough to still allow slight
adjustment of the tubes, or to allow easily
breaking and grinding of the tacks if further
large adjustments are needed. DO NOT tack
the tubular components to the Mount Plates
yet. Remove the ratchet straps.
FIGURE 10
13. Place the B-Pillar L&R
11
into position on
either side of the Jeep. Each B-Pillar is
positioned vertically, from the B-Pillar Mount
Plate to the Main Side Hoop. Use the laser-
etched placement marks along the underside
of the Main Side Hoop to position the B-Pillar,
and tack-weld it to the Main Side Hoop (do
not tack it to the Mount Plate yet).
FIGURE 10
14. Place each Forward Stringer L&R
15
into position between the A-Crossbar and
B-Crossbar. Use the laser-etched marks
on each Crossbar to properly position the
Forward Stringers, and tack them into place.