beautypg.com

Installation instruc tio ns – Poison Spyder CJ-7 FULL CAGE KIT User Manual

Page 4

background image

INSTALLATION INSTRUC

TIO

NS

Poison Spyder Customs • CJ-7 FULL CAGE KIT INSTALL

Page 4

©2011 POISON SPYDER CUSTOMS, INC. • 951-849-5911 • WWW.POISONSPYDER.COM

FIGURE 10

Use a square to ensure that the Crossbars

are exactly perpendicular to the Main Side

Hoops, and that the Main Side Hoops are

perpendicular to the Jeep’s floor. Use a dead

blow hammer to gently tap the components

into adjustment. Work your away around the

assembly a couple of times, as adjustments

you make at one end may affect the placement

at the other. During this procedure, ensure

that the ratchet straps stay tight and Main

Side Hoops remain firmly seated into the

laser-cut notches of the Crossbars.

FIGURE 10

12. Tack-weld the cage at each joint of the

assembly so far. These tack welds should be

big enough to temporarily hold the assembly

together, but small enough to still allow slight

adjustment of the tubes, or to allow easily

breaking and grinding of the tacks if further

large adjustments are needed. DO NOT tack

the tubular components to the Mount Plates

yet. Remove the ratchet straps.

FIGURE 10

13. Place the B-Pillar L&R

11

into position on

either side of the Jeep. Each B-Pillar is

positioned vertically, from the B-Pillar Mount

Plate to the Main Side Hoop. Use the laser-

etched placement marks along the underside

of the Main Side Hoop to position the B-Pillar,

and tack-weld it to the Main Side Hoop (do

not tack it to the Mount Plate yet).

FIGURE 10

14. Place each Forward Stringer L&R

15

into position between the A-Crossbar and

B-Crossbar. Use the laser-etched marks

on each Crossbar to properly position the

Forward Stringers, and tack them into place.

FIGURE 10