beautypg.com

Poison Spyder JK 07-10 BOLT-TOGETHER TRAIL CAGE User Manual

Installation instruc tio ns

background image

INSTALLATION INSTRUC

TIO

NS

©2010 POISON SPYDER CUSTOMS, INC. • 951-849-5911 • WWW.POISONSPYDER.COM

‘07-’10 JK BOLT-TOGETHER TRAIL CAGE

INSTALLATION INSTRUCTIONS

Installing the Poison Spyder Customs JK Bolt-

Together Trail Cage is about medium in difficulty,

with the right tools and good mechanical abilities.

It is, however, a rather lengthy procedure so

patience and attention to detail is important. If

you are not confident in your mechanical skills,

please seek the help of a professional to perform

the installation. Please read through these entire

instructions before proceeding with installation.

PARTS LIST

(1) Driver Side A-Pillar Assembly

1

(1) Passenger Side A-Pillar Assembly

2

(1) Driver Door Header Bar Assembly

3

(1) Passenger Door Header Bar Assembly

4

(1) Dash Bar

5

(1) Front Overhead Assembly

6

(2) A-Pillar Fill Plate

7

(2) Small A-Pillar Foot Spacer

8

(2) Large A-Pillar Foot Spacer

9

(1) Rear Center Stringer

10

(4-Door Only)

(4) 1/2-13 X 3 Gr8 Hex Head Cap Screw
(4) 1/2-13 X 1-1/2 Gr8 Hex Head Cap Screw
(16) 1/2 Flat Washer
(8) 1/2-13 Nylon Insert Lock Nut
(12) 5/16-24 X 1-1/4 Socket Head Cap Screw
(3/6*) 7/16-20 X 2-1/2 Gr8 Hex Head Cap

Screw

(6/12*) 7/16 Flat Washer
(3/6*) 7/16-20 Grade “C” All Metal Lock Nut
(6) 3/8-24 X 1-1/4 Gr8 Hex Head Cap Screw
(6) 3/8 Flat Washer

3

6

10

5

1

7

7

9

9

8

8

4

2