beautypg.com

Pre-operation inspection and service, Pre-operation inspection and service -19, Operation – Alamo FC-0016 User Manual

Page 117: Opera t ion

background image

OPERATION

A96B 03/06

Operation Section 4-19

© 2006 Alamo Group Inc.

OPERA

T

ION

9. PRE-OPERATION INSPECTION AND SERVICE

Before each use, a pre-operation inspection and service of the implement and tractor must be performed.

This includes routine maintenance and scheduled lubrication, inspecting that all safety devices are equipped

and functional, and performing needed repairs. DO NOT operate the unit if the pre-operation inspection

reveals any condition affecting safe operation. Perform repairs and replacement of damaged and missing

parts as soon as noticed. By performing a thorough pre-operation inspection and service, valuable down time

and repair cost can be avoided. OPS-U-0029

Always disconnect the main PTO Driveline from the Tractor before performing service on

the Implement. Never work on the Implement with the tractor PTO driveline connected and

running. Rotating Parts, Blades or Drivelines could turn without warning and cause immediate entanglement,

injury or death.

(S3PT-11)

Never work under the Implement, the framework, or any lifted

component unless the Implement is securely supported or blocked up

to prevent sudden or inadvertent falling which could cause serious

injury or even death.

(SG-14)

Periodically inspect all moving parts for wear and replace when

necessary with authorized service parts. Look for loose fasteners, worn

or broken parts, and leaky or loose fittings. Make sure all pins have cotter pins and

washers. Serious injury may occur from not maintaining this machine in good working

order.

(SG-21)

This manual is related to the following products: