beautypg.com

Installation, General, Receiving inspection – ADTRAN MX410 User Manual

Page 39: Adtran shipping contents, Section 4 installation -1, General -1, Receiving inspection -1, Adtran shipping contents -1

background image

61189500L1-1B

PRELIMINARY

4-1

Section 4

Installation

GENERAL

The first three tasks for installing and operating the MX410/MX412 are to unpack, inspect,
and install. Those tasks are detailed in this section of the manual, as well as information for
mounting the MX410/MX412 into an equipment rack or to a wall, making the proper connec-
tions to the front and back panels, identifying the front panel indicators, and adding or
removing a Power Supply Unit (PSU) (MX410 only).

RECEIVING INSPECTION

Inspect the MX410/MX412 for any damage that might have occurred in shipment. If damage
is suspected, file a claim immediately with the carrier, keep the original packaging for damage
verification and/or returning the unit, and contact ADTRAN Customer Service. For warranty
information, refer to

“Appendix A, Warranty”

.

ADTRAN SHIPPING CONTENTS

After unpacking the MX410 or MX412 but before an initial power up, be sure that the
following items are present:

• MX410 and MX410 PSU

or
MX412

• Mounting brackets and screws for 19-inch rack or wall installation

– Ground lug with nut and lock washer
– Wire-wrap post cover and screw
– Power connector
– Blank PSU cover (MX410 only)