beautypg.com

Hardware installation, Site preparation, Location – Allied Telesis AT-TS24TR User Manual

Page 28: Ventilation, Power, Chapter 2

background image

11

Chapter 2

Hardware Installation

Site Preparation

Attention

Improper installation of the chassis can expose personnel to high voltages,
risking the possibility of injury or death. Before installing TurboStack
hubs, read the See Electrical Safety and Installation Requirements on
page i.

Location

A TurboStack hub can operate as a standalone product, or installed in a
chassis or in a 19-inch rack.

Ventilation

The site must have adequate ventilation to provide an operating
environment consistent with TurboStack specifications. Hubs have
internal fans to aid in cooling. Chassis models are also equipped with fans.
For the fans to function correctly, you must not block the ventilation
openings located on the sides of the chassis.

Attention

Maximum ambient temperature is 40

o

C with a department concentrator

chassis.

Power

Power connections for each unit should be able to provide 50 watts at 120
VAC for U.S.A. versions or 240VAC for international versions. It is
advisable to use dedicated power circuits or power conditioners to supply
power to the network devices. This aids in isolating the network
equipment from electrical power “noise.”

This manual is related to the following products: