Agent menu – Allied Telesis AT-VIEW PLUS 3.0 DEVICE MANAGEMENT User Manual
Page 179
Allied Telesyn
AT-VIEW PLUS
DEVICE MANAGEMENT
RPS
Green
Red
Gray
The switch is receiving power from the redundant power
supply.
RPS has failed.
RPS is not installed or RPS monitoring is disabled.
DUPLEX Green
Orange
The port is operating at full duplex.
The port is operating at half duplex.
Note
- The current firmware version does not allow AT-View Plus Device Manager to support the
Reset button.
Note
for the operations and behavior of the uplink modules
installed in this device.
Note
- To turn RPS monitoring on or off on the switch, from the switch command line interface
enter the command SET SYSTEM RPSMONITOR={ON|OFF}. To see whether RPS monitoring is
on, use the command SHOW SYSTEM. To turn on RPS monitoring using SNMP, set the
fanAndPsRpsMonitoringStatus variable to on.
Agent Menu
From the Agent menu, you can view and edit the system information for the switch, or log into the
CLI using Telnet.
System Info
Displays basic system information, including system name, location, contact and description.
Power Supply Info
Displays information about the power supply, redundant power supply and power supply
monitoring.
File List
Displays a list of the files in the switch's file system.
Config File Name
Displays the file name of the start-up configuration file.
Telnet
Connects to the switch's Telnet server
WEB browser
Opens your web browser and connects to the switch's HTTP server.
PN 613-50665 Rev A
Page 179 of 257