NORD Drivesystems BU0220 User Manual
Page 21
BU 0220 GB-0912
Subject to technical amendments
21
2.2.2.1 Control connections SK CU4-PBR
The terminal bar of the customer unit SK CU4-PBR is divided into two potential levels.
Connection of up to 2 sensors is made on the terminal bar (terminals C1 and C2).
NOTE
Looping of the 24V supply voltage (terminals 40/44) is possible, however a maximum
current load of 2A for the SK CU4-PBR must not be exceeded.
46
81
82
47
83
46
81
82
44
40
78
77
C2
C1
40
44
PBR A
PBR B
PBR A
PBR B
Sys+
Sys-
GND B
GND B
VP +5V
Incoming
PROFIBUS DP cable
Outgoing
PROFIBUS DP cable
Connection of the 24V power
supply from the SK 2xxE
System bus connection
from the SK 2xxE
Potential level:
System bus
Potential level:
Field bus
24V
GND
Connection to the
terminal block of the SK CU4-PBR
SK CU4-
SK 2xxE-
- B1000 (820 pages)
- B2000 (60 pages)
- B1050 (36 pages)
- B2050 (48 pages)
- B1091 (28 pages)
- B1091-1 (28 pages)
- B1092 (52 pages)
- B1901 (6 pages)
- B1904 (23 pages)
- BU0180 (184 pages)
- BU0200 (314 pages)
- BU0210 (60 pages)
- BU0230 (76 pages)
- BU0240 (40 pages)
- BU0260 (116 pages)
- BU0270 (76 pages)
- BU0280 (78 pages)
- BU0290 (76 pages)
- BU0300 (148 pages)
- BU0310 (8 pages)
- BU0320 (2 pages)
- BU0500 (180 pages)
- BU0505 (188 pages)
- BU0510 (81 pages)
- BU0530 (56 pages)
- BU0540 (64 pages)
- BU0550 (100 pages)
- BU0560 (4 pages)
- BU0570 (44 pages)
- BU0590 (48 pages)
- BU0700 (131 pages)
- BU0701 (1 page)
- BU0710 (32 pages)
- BU0750 (157 pages)
- BU0930 (8 pages)
- BU0940 (44 pages)
- BU2100 (34 pages)
- BU2200 (42 pages)
- MI0300 (36 pages)
- MI0700 (84 pages)
- BU0000 (85 pages)
- BU0010 (4 pages)
- BU0020 (104 pages)
- BU0040 (60 pages)