Section 2 - installation, 1 unpacking and inspection, 2 terminations and controls – KEPCO ATE-DMG SERIES User Manual
Page 25: Unpacking and inspection -1, Terminations and controls -1
ATE-DMG 042314
2-1
SECTION 2 - INSTALLATION
2.1
UNPACKING AND INSPECTION
This instrument has been thoroughly inspected and tested prior to packing and is ready for
operation. After carefully unpacking, inspect for shipping damage before attempting to operate.
Perform the preliminary operational check as outlined in PAR. 2.5 below. If any indication of
damage is found, file an immediate claim with the responsible transport service.
2.2
TERMINATIONS AND CONTROLS
a) Front Panel: Refer to Table 2-1 and Figure 2-1.
b) Rear panel: Refer to Table 2-4 and Figure 2-2.
c) Internal Controls: See Table 2-3 and Figure 2-3.
TABLE 2-1. FRONT PANEL CONTROLS, INDICATORS AND TERMINATIONS
FIGURE 2-1
INDEX NO.
CONTROL OR TERMINATION
FUNCTION
1
A-C Power switch/circuit breaker
Serves as a-c power switch and turns a-c power off upon overload or over-
voltage (hardware induced).
2
Liquid Crystal Display (LCD)
2 x 16 character display with LED backlight. Shows voltage, current mode,
settings, menu, program, etc. See PAR. 3.4.1.3 for details,.
3
“V” Mode indicator
Energizes in Voltage Mode.
4
“I” Mode Indicator
Energizes in Current Mode.
5
Keypad
Used to for digital control of all local functions. See PAR. 3.4.1.4 for details.
6
DISARM pushbutton
Push to set Crowbar trigger level
7
CROWBAR indicator
Lights when crowbar is triggered “ON.”
8
LEVEL control
Adjusts trigger level of crowbar circuit.