After the curtains are secured to the hook & loop strips on the sides of the track units in step 6, insert the
tubular weights into the folds of the curtain. This will pull the curtain taut as the hook & loop strip is pressed
securely.
8.
Repeat steps 1 through 7 for all side wall curtain systems.
9.
Install top covers. Attach top covers to guide brackets with nuts and screws provided.
10.
Install electrical power to the tubular motor. See Section “Electrical Wiring Diagram”.
11.
Work out any bulges or creases in the curtains by unzipping and zipping the hook & loop strips as required to
achieve a tight fit.
12.
This completes curtain installation.
1. Bring loose end of Curtain
Behind and over top bar.
Secure the hook & loop strip
of curtain to the hook & loop
strip on the top bar.
2. Secure the hook & loop
strips along the edges of the
curtain to the hook & loop
strips on the track units.
3. Insert weights into folds of
curtain.
a
b
c
Completing Curtain Installation
Weights
(Insert into
folds of curtain)
b.
Secure the hook & loop strips along the
edges of the curtain to the hook & loop
strips on the track units.
a.
Bring front panel of curtain behind and
over top bar. Secure front panel hook &
loop strip to hook & loop strip on top of top
bar.
c.
I
nsert cylindrical weights into folds of curtain.
Place curtain (with weights installed) into the
inside of the track unit. Press hook & loop strips
of curtain against hook & loop strips on the track
units.