Yokogawa Data Acquisition with PID Control CX2000 User Manual
Yokogawa Sensors
This manual is related to the following products:
Table of contents
Document Outline
- Terms and Conditions of the Software License
- Chapter 1 Before Using the DAQSTANDARD
- Chapter 2 Viewing and Creating Setup Data
- 2.1 Confirming the Setup Data
- 2.2 Configuration
- 2.3 Setting the Measurement Channels
- 2.4 Setting the Computation Channels (/M1 Option)
- 2.5 Configuring the Engineering Mode
- 2.6 Configuring the System Mode
- Alarm/Relay/Remote
- Scan Interval/Memory/Memory Timeup
- Channel (Setting the Burnout and RJC)
- Application
- Timer (/M1 Option)
- Report (Creating Hourly/Daily/Weekly/Monthly Reports, Option)
- Temperature Unit, Time Zone, Time deviation limit, System Relay and Auxiliary Functions
- Active Storage Change
- Network
- Setting the Modbus Master
- Setting SNTP
- 2.7 Adjusting the Setup Data (Checking the Data)
- 2.8 Saving the Setup Data
- 2.9 Printing the Setup Data
- 2.10 Characters That Can Be Used
- Chapter 3 Receiving and Sending Setup Data
- Chapter 4 Troubleshooting
- Index