IAI America RCP4-RA6R User Manual
Page 50

2. Installation
44
[6] Attachment of Work Part (Transported Object)
Utilize the threaded part on the rod tip to attach the work part (transported object). In the installation process,
make sure to hold 2 faces on the tip with a wrench so the tightening torque would not be applied to the rod.
[7] Mounting䎃Surface䎃
x
The platform to install the actuator should possess a structure that ensures enough stiffness, and should be
free from vibration.
x
The surface where the actuator will be mounted should be a machined surface or that with an accuracy
equivalent to it, and the flatness should be 0.05mm/m or below.
x
Ensure a room for maintenance work.
x
The side and bottom surfaces of the base on the actuator work as the datum surfaces for the side of the rod.
x
Use these surfaces as the datum surfaces for mounting.
Follow the diagram below when installing the device using the reference surface.
Model Name A Dimensions [mm]
RA5/6
2 to 4 or less
Datum Surface
Datum Surface
R0.3 or less