beautypg.com

Deployment and maintenance, 1 transporting platform and deployment examples, Pontoon platform on inland reservoir – YSI Vertical Profiler Systems User Manual

Page 74: Deployment & maintenance

background image

YSI Profiler System USER Manual

Deployment & Maintenance

6.1 Transporting Platform and Deployment Examples

After all pre-deployment testing is completed, you will now need a plan to transport your
Floating Platform system to it remote site. The pontoon version can normally be taken by trailer
to the water where final checkout of the system is recommended. The buoy version may require
a hoist or some other means to transfer it to the water. There are many ways to handle this.

Below are a few photographs of deployment procedures to give you some ideas. Do not hesitate
to contact Endeco/YSI if you need help. Contact information is in Appendix A of this manual.


Pontoon Platform on Inland Reservoir


Figure 6-1 Final checkout using Diagnostic

Cable and laptop PC to test system just prior

to launch onto an inland reservoir.

Figure 6-2 Panels in place, Profiler secured
to side of motor boat for transport to remote
site on reservoir
.


The deployment shown above is seasonal. In late fall the platform is removed for cleaning and
maintenance. Routine maintenance is described below in this section.





YSI Environmental

669523 Rev B

Page 6-1