Verify winch operation – YSI Vertical Profiler Systems User Manual
Page 42
YSI Profiler System USER Manual
Figure 3-8 Connect Winch Motor Cable to Controller (J2)
VERIFY WINCH OPERATION
First, verify that the motor power cable is connected to J2 of the Controller Assembly. After you
make the battery power connection to the controller, use the special magnetic slide switch to test
if the winch will pay out and reel in when the switch is activated. Placing the magnet side down
in the groove should result in movement of the winch drum. You should hear a click from the
relay contacts. The winch drum should move. Next slide the switch in the groove to control
direction of the cable movement. The sonde need not be attached for this test. To stop winch
movement, pull the magnetic slider away from the groove. This manual test verifies winch
movement. If the winch does not behave as described above, check all connections, check
battery voltage and repeat the procedure.
Figure 3-9 Magnetic Slide Switch to Test Winch System
YSI Environmental
669523 Rev B
Page 3-13
- 3100 (50 pages)
- 3200 (86 pages)
- 5000 (70 pages)
- 5200 (148 pages)
- 5200A (128 pages)
- 5200A (121 pages)
- 5400 (127 pages)
- 5239 Dissolved Oxygen Probe (23 pages)
- 55 (26 pages)
- 550A (18 pages)
- 556 MPS - Quick Start Guide (4 pages)
- 58 (40 pages)
- 5905 (22 pages)
- 6600V2 - User Manual (379 pages)
- 60 (33 pages)
- 63 (46 pages)
- 650 MDS (72 pages)
- 9300 Photometer (11 pages)
- 9500 Photometer (143 pages)
- 9500 Photometer (18 pages)
- CR 3200 Thermoreactor (42 pages)
- CR 4200 Thermoreactor (42 pages)
- CR2200 Thermoreactor (36 pages)
- DO200 (40 pages)
- EC300 (40 pages)
- EC300A (40 pages)
- EC30A (12 pages)
- IFL 700 IQ (46 pages)
- IQ SensorNet 2020 XT Terminal (196 pages)
- IQ SensorNet FDO Sensor (48 pages)
- IQ SensorNet MIQ/A-MOD Module (42 pages)
- IQ SensorNet MIQ/A-PR Module (36 pages)
- IQ SensorNet MIQ/IC2 Module (30 pages)
- IQ SensorNet MIQ/IF232 Module (18 pages)
- IQ SensorNet MIQ/JB Module (18 pages)
- IQ SensorNet MIQ/JBR Module (20 pages)
- IQ SensorNet MIQ/PS Module (22 pages)
- IQ SensorNet MIQ/R6 Module (56 pages)
- IQ SensorNet NitraLyt Sensor (64 pages)
- IQ SensorNet SensoLyt Sensor 700 IQ (SW) (46 pages)
- IQ SensorNet Sensors Encoded Fieldbus Data (12 pages)
- IQ SensorNet TetraCon Sensor 700 IQ (SW) (32 pages)
- IQ SensorNet ViSolid Sensor 700 IQ (60 pages)
- MultiLab 4010-1 (108 pages)
- MultiLab 4010-2 (138 pages)