YSI Vertical Profiler Systems User Manual
Page 2

Table of Contents
Page
Section 1 Introduction
1.1 System Overview
1-1
1.2 System Description
1-1
1.3 Getting Started
1-4
Section 2 Profile Routine
2.1 Software Installation
2-1
2.2 Using Profile Wizard to Create a Profile Routine
2-4
2.3 How the CR10X Executes a Profile Routine
2-17
Section 3
Equipment Staging – Sonde & Components
3.1 Introduction
3-1
3.2 Setting Sonde Parameters
3-1
3.3 Connecting & Checking Profiler Components
3-9
Section 4
Equipment Staging – PC / CR10X Communications
4.1
Introduction
4-1
4.2 Setting Up Communication from PC to Station
4-1
4.3 Downloading Program File to Station
4-10
Section 5
Pre-Deployment Testing
5.1 Setting Up LoggerNet for System Testing
5-1
5.2 Testing with Ports and Flags
5-6
5.3 Start a Profiling Sequence
5-12
Section 6
Deployment
& Maintenance
6.1 Transporting Platform to Profile Location
6-1
6.2 Testing Communications
6-3
6.3 Maintenance – Servicing Sonde
6-4
6.4 Maintenance – Servicing Other System Components
6-5
6.5 Maintenance Schedule
6-7
Section 7
Data Collection & Analysis
7.1 Data Collection
7-1
7.2 YSI Profile Data Manager
7-1
7.3 Data Analysis
7-2
7.4 Automation Setup
7-6
7.5 FTP Site Test
7-13
i