Modifications reserved
Page 23/54
GE_UPS_ISG_TLE_SUL_M22_M50_1US_V010.docx
Installation Guide TLE Series 225 - 500 UL S1
4.6 UNPACKING
Move the equipment in it‟s original packing, carton box or wooden case, until the place of installation
and remove the packing and the transport sockets only just before installing the UPS.
Be aware of the heavy weight of the UPS, pay attention when moving the UPS cabinet.
White color
=
without any anomaly
Red color
=
anomaly evidence
The package of the TLE Series 400 & 500
is equipped with ShockWatch (indicator
for shock), and TiltWatch (indicator for
overthrow) on the outside.
These devices indicate an eventual shock
or overthrow during transport.
Whenever these devices show a possible
anomaly, the UPS shall not be
commissioned before consulting a
“Service Center”.
Fig. 4.6-1 ShockWatch device
Fig. 4.6-2 TiltWatch device
NOTE !
Take care not to damage the UPS when moving by forklift.
A damaged UPS must never be installed or connected to Utility or Battery!
In case of any damage sustained during the transport, immediately inform the
shipping agent!
A detailed report of the damage is necessary for any indemnity claim.
Included in the delivery you can find the following parts:
An accessories bag.
Air inlet grids, which must be mounted on the bottom of the cabinet UPS with the screws included.
Control Bus cables for inter-connecting the UPS modules (only For the RPA system).
The documentation includes the “User Manual” and the “UPS Safety Rules”.