GE Industrial Solutions TLE Series 225-500 Installation Guide User Manual
Installation guide, Critical power, Imagination at work
Table of contents
Document Outline
- 1 IMPORTANT SAFETY INSTRUCTIONS
- 2 LAYOUT
- 3 ENVIRONMENT
- 4 INSTALLATION
- 4.1 TRANSPORT
- 4.2 DELIVERY
- 4.3 STORAGE
- 4.4 PLACE OF INSTALLATION
- 4.5 VENTILATION AND COOLING
- 4.6 UNPACKING
- 4.7 ELECTRICAL WIRING
- 4.8 WIRING CONNECTION
- 4.8.1 TLE Series 225 & 250 - Power connection with Common Input Utility
- 4.8.2 TLE Series 225 & 250 - Power connection with Dual Input Utility
- 4.8.3 TLE Series 400 & 500 - Power connection with Common Input Utility
- 4.8.4 TLE Series 400 & 500 - Power connection with Dual Input Utility
- 4.8.5 Use of TLE Series 225 - 500 in eBoost™ Operation Mode
- 4.8.6 Use of TLE Series 225 - 500 as frequency converter
- 4.9 RPA PARALLEL SYSTEM CONNECTION
- 4.10 EPO COMMAND CONNECTION (EMERGENCY POWER OFF)
- 5 CUSTOMER INTERFACE
- 5.1 SERIAL PORT J35µP - RS232 (SUB D, FEMALE 9 PIN)
- 5.2 CUSTOMER INTERFACE BOARD
- 5.2.1 Connector J1 – RJ45 8P8C
- 5.2.2 X1 terminal block - Output signals on voltage-free contacts
- 5.2.3 X1 terminal block - Programmable input free contacts
- 5.2.4 X2 terminal block - EPO (Emergency Power Off)
- 5.2.5 X1 terminal block - Gen Set Signalling (GEN ON)
- 5.2.6 X1 terminal block - AUX external Maintenance Bypass
- 5.2.7 X1 terminal block - eBoost/IEMi control signal
- 6 NOTES