National Instruments FP-3000 User Manual
Page 150

Index
FieldPoint FP-3000 User Manual
Index-8
© National Instruments Corporation
G
GAIN parameter, B-9
get_status function (table), 4-13
GRANT_DENY parameter, B-9 to B-10
Grouping operator, in Expression block
(table), 4-9
H
HARD_TYPES parameter, B-10
heating element, controlling
(example), 3-11 to 3-13
assigning tag to new block, 3-11
bringing block online, 3-12 to 3-13
creating FP-AO-200 block, 3-11
scaling output, 3-12
selecting module and channel, 3-11
setting output range, 3-11
HI_ALM parameter, B-10
HI_HI_ALM parameter, B-10
HI_HI_LIM parameter, B-10
HI_HI_OUT_D parameter, C-7
HI_HI_PRI parameter, B-10
HI_LIM parameter, B-10
HI_OUT_D parameter, C-8
HI_PRI parameter, B-11
HotPnP
avoiding damage to network module and
terminal bases (note), 1-5
overview, 1-4 to 1-5
I
IN parameter, B-11
IN_1 parameter, B-11
initial power on procedure, 3-1 to 3-2
Initialization Manual mode (table), 4-23, B-15
INIT_STATUS parameter, C-8
input range, setting
converting 4-20 mA pressure sensor to
Fieldbus (example), 3-4
temperature control with FP-3000
(example), 3-9
installation
connecting FP-3000 to Fieldbus
network, 2-10 to 2-13
connecting power to
FP-3000, 2-10 to 2-13
bank power requirements, 2-10
calculating power for bank, 2-12
I/O power requirements, 2-10 to 2-11
isolation, 2-11
power connections, 2-12 to 2-13
supplying power for outputs, 2-11
device description files
importing, 2-1 to 2-2
updating, 2-2
LED indicators, 2-13 to 2-16
mounting FP-3000 on DIN rail, 2-3 to 2-5
connecting terminal bases, 2-4 to 2-5
removing FP-3000, 2-5
mounting FP-3000 to a panel, 2-5 to 2-7
connecting terminal bases, 2-6 to 2-7
removing FP-3000, 2-7
mounting I/O modules onto terminal
bases, 2-7 to 2-9
inserting new I/O modules during
operation, 2-8
removing I/O modules, 2-8
replacing I/O modules during
operation, 2-8 to 2-9
power-on-self test (POST), 2-13 to 2-16
updating FP-3000 firmware, 2-17
instantiating blocks, 1-3
interoperability of FP-3000, 1-4