beautypg.com

118 operating manual, Hot-plug components, Bx900 s1 – FUJITSU BX900 S1 User Manual

Page 118

background image

118

Operating Manual

BX900 S1

Hot-plug components

©

c

o

gn

itas

. G

es

el

ls

ch

ft f

ür

T

ec

h

ni

k-

Do

ku

m

en

tat

io

n

m

bH

2

01

1

P

fa

d:

C

:\P

rogr

am

m

e

\F

CT

\t

im

_ap

p\

tim

_l

oc

al

\w

ork

\W

A

LT

E

R

\O

B

J_

DO

K

U

-4

95

3-0

07

.fm

I

The two connection blades within a fabric must have the same
technology, i.e. either Ethernet or Fibre Channel or Infiniband or SAS.

When filling the slots in fabrics 2, 3 and 4, also make sure the server blades are
fitted with the appropriate mezzanine cards. The following rules apply for fitting
the mezzanine card slots of the server blades:

If a 1 Gb Ethernet mezzanine card is installed in slot 1 of a server blade, at
least one 1 Gb Ethernet connection blade must be installed in fabric 2 of the
system unit.

If a 10 Gb Ethernet mezzanine card or a 10Gb CNA mezzanine card is
installed in slot 1 of a server blade, at least one 10 Gb Ethernet connection
blade must be installed in fabric 2 of the system unit.

If an FC mezzanine card is installed in slot 1, at least one FC connection
blade must be installed in fabric 2.

If an Infiniband mezzanine card is installed in slot 1, an Infiniband connection
blade must be installed in fabric 2.

I

In this case, only one of two channels of the Infiniband mezzanine
card is used.

If a 1 Gb Ethernet mezzanine card is installed in slot 2 of a server blade, at
least one 1 Gb Ethernet connection blade must be installed in fabric 3 or in
fabric 4 of the system unit.

If a 10 Gb Ethernet mezzanine card or a 10Gb CNA mezzanine card is
installed in slot 2 of a server blade, at least one 1 Gb Ethernet connection
blade must be installed in fabric 3 of the system unit.

If an FC mezzanine card is installed in slot 2, at least one FC connection
blade must be installed in fabric 3.

If an Infiniband mezzanine card is installed in slot 2, Infiniband connection
blades should be installed in fabrics 3 and 4.

I

In this case, both channels of the Infiniband mezzanine card are
used.

If a SAS mezzanine card is installed in slot 2, at least one SAS connection
blade must be installed in fabric 3.

You can install combinations of FC, Ethernet, Infiniband and SAS
mezzanine cards in a server blade. In this case, the mezzanine card slots
may be equipped as follows.