SMA SMC 7000HV Installation User Manual
Page 45

SMA Solar Technology AG
Electrical Connection
Installation Manual
SMC70HV11-IA-IEN112970
45
8. Only in the middle inverter (the one with
2 insulated conductors for each terminal), insert 
one of the provided jumpers into the lowest of the 
three slots as depicted on the right.
Do not plug the jumpers in the bottom slot of the 
two other inverters.
or
Bridge the "A" and "B" screw terminals on the 
middle inverter with a wire bridge.
Do not bridge the "A" and "B" screw terminals in 
the two other inverters.
9. Measure the resistance between the terminal
block's positive and negative poles in the middle 
inverter.
☑ If the resistance is approximately 27.8 k Ω 
(±370 Ω ), the SMA Power Balancer has been 
connected correctly. Otherwise, check the 
cabling.
10. Close all inverters as described in section 7.3 "Closing the Inverter" (page 59).
Connection with one Sunny Mini Central 9000TL, 10000TL or 11000TL
In order to be able to connect the SMA Power Balancer to a Sunny Mini Central 9000TL, 
10000TL or 11000TL, the Sunny Mini Central 7000HV must be equipped with a special 
plug (Order No. PBL-SMC-10-NR). Three inverters are then connected together with a 
special connection cable.
You can order the plug and the connection cable from SMA Solar Technology AG or your 
dealer. Section 12 "Accessories" (page 84) contains a list of the order numbers.