beautypg.com

4 commissioning (installer), 1 commissioning the sunny beam, Commissioning (installer) – SMA BEAM-BT-11 User Manual

Page 19: Commissioning the sunny beam

background image

SMA Solar Technology AG

Commissioning (Installer)

User Manual

BeamBT11-BA-BEN112713

19

4 Commissioning (Installer)

4.1 Commissioning the Sunny Beam

Requirements:

☐ You have detected a free NetID using Sunny Explorer, also at the planned installation location

of the Sunny Beam (see Sunny Explorer help).

☐ You have configured the same free NetID for all devices.
☐ You have started all the devices in the plant.
☐ Using the Sunny Explorer, you have changed the plant passwords configured upon delivery

(see Sunny Explorer help). All inverters have the same plant password for "User". All inverters

have the same plant password for "Installer". The plant passwords for "User" and "Installer" are

different.

☐ For plants with inverters with SMA Bluetooth Piggy-Back: All inverters feed in.

For PV plants with one inverter, NetID 1 is possible

You may keep the default NetID set to 1 in your inverter upon delivery if your Bluetooth
PV plant consists of the following products:

• A maximum of one inverter
• A maximum of one computer with Bluetooth and Sunny Explorer software
• A maximum of one Sunny Beam of the type BEAM-BT-11.GR1

or

• A maximum of one inverter
• A maximum of two Sunny Beams of the type BEAM-BT-11.GR1

In all other cases, you must detect a free NetID (see Sunny Explorer help).