Grass Valley Performer SD User Manual
Page 96

2-64
Section 2 —
Installation
T
NX-SCP Serial Control Panel Cabling
The SCP requires two cables: one communications (RS232
or
RS422, never both) and one power cable. Cabling for the SCP
is described in the following order:
■
RS232, Single Performer
1
■
RS422, Dual Mode
■
RS422, X–Y Mode
■
Connection Through Modem
■
Power Connection
RS232, Single Performer
Connect a TNX–IRS cable, assembly 056857, from the SCP
RS232 connector to the Performer REMOTE connector. The
cable length is sized according to your order, the maximum
length is 50 feet (15 meters).
1. If you are controlling a single Performer, you may use RS232. If you are controlling two
or more, you must use RS422.
TNX-SCP Panel
Performer, Address 0
TNX-IRS Cable,
part number 056857
See also other documents in the category Grass Valley Equipment:
- LDK 5302 (24 pages)
- SFP Optical Converters (18 pages)
- 2000GEN (22 pages)
- 2011RDA (28 pages)
- 2010RDA-16 (28 pages)
- 2000NET v3.2.2 (72 pages)
- 2000NET v3.1 (68 pages)
- 2020DAC D-To-A (30 pages)
- 2000NET v4.0.0 (92 pages)
- 2020ADC A-To-D (32 pages)
- 2030RDA (36 pages)
- 2031RDA-SM (38 pages)
- 2041EDA (20 pages)
- 2040RDA (24 pages)
- 2041RDA (24 pages)
- 2042EDA (26 pages)
- 2090MDC (30 pages)
- 2040RDA-FR (52 pages)
- LDK 4021 (22 pages)
- 3DX-3901 (38 pages)
- LDK 4420 (82 pages)
- LDK 5307 (40 pages)
- Maestro Master Control Installation v.1.5.1 (455 pages)
- Maestro Master Control Installation v.1.5.1 (428 pages)
- 7600REF Installation (16 pages)
- 7600REF (84 pages)
- 8900FSS (18 pages)
- 8900GEN-SM (50 pages)
- 8900NET v.4.3.0 (108 pages)
- Safety Summary (17 pages)
- 8900NET v.4.0.0 (94 pages)
- 8906 (34 pages)
- 8911 (16 pages)
- 8900NET v.3.2.2 (78 pages)
- 8914 (18 pages)
- 8912RDA-D (20 pages)
- 8916 (26 pages)
- 8910ADA-SR (58 pages)
- 8920ADC v.2.0 (28 pages)
- 8920ADC v.2.0.1A (40 pages)
- 8920DAC (28 pages)
- 8920DMX (30 pages)
- 8920ADT (36 pages)
- 8920MUX (50 pages)
- 8921ADT (58 pages)