beautypg.com

Switcher power-up, Switcher power-up -8 – Grass Valley Performer SD User Manual

Page 40

background image

2-8

Section 2 —

Installation

Switcher Power-Up

Once you have completed setup, mounting, and cabling you can
apply power to the system and perform an operational check.

To power up and perform an operational check:

1.

Connect the AC line cord from switcher to an AC main.

1

At this point, Performer does a self-test.

NOTE:

Displays may be accelerated by pressing any of buttons 1

through 8 on the Performer front panel or skipped entirely by
pressing any other button.

Status information is displayed in the following order:

*Performer automatically adjusts itself to NTSC or PAL video
signals.

1. Due to the variation in styles, you must provide and install the
AC plug end for export units (PFR-240).

Start-up
Display

Protocol or Test

88 88 88

LED test

rE SE t

Warm reset

10 20

TEN-20 compatible

7 68 00

Baud rate

PA r n8

No parity / 8 data bits

SO 1- 10

No source offset

DE St 01

No destination offset

LV L1 23

No level offset

SL AV E0

Master mode

NT SC

NTSC video source*