beautypg.com

Configuration worksheets, Pre-installation questionnaire, Node summary worksheets – Verilink AS2000: The Basics (880-502981-001) Product Manual User Manual

Page 38: Configuration worksheets -8, Snmp node planning worksheet -8

background image

Site Planning

3-8

Verilink Access System 2000: The Basics

If your equipment causes harm to the telephone network, your
local telco can discontinue your service.

You are required to notify the telephone company before
disconnecting this unit from the network.

Configuration Worksheets

This section provides information to help determine your AS2000
configuration, and includes site planning and node configuration
worksheets. Examples of worksheets filled out before hardware
installation and software configuration are also shown.

Pre-installation

Questionnaire

The pre-installation questionnaire provides critical need-to-know
information before AS2000 installation and configuration. Cabling
distances are critical.

T1 line framing: ESF or SF (D4).

T1/E1 line coding: AMI, B8ZS, B3ZS, HDB3.

T1/E1 line fractional: yes or no.
If yes, which DS0s (Level 0 channels) are assigned?

Is the T1/E1 installed and tested end to end?

Distance from the T1/E1 demarcation to the AS2000.

Distance from the AS2000 to the DTE devices.

Type of DTE interface (RS–232, RS–449, V.35, EIA 530, X.21,
HSSI).

Type of DTE devices (bridge, video, router, etc.).
Is DTE equipment part of a tail circuit? yes or no.

Expected DTE data rate (kbit/s, Mbit/s).

What is the distance from the AC outlet to the AS2000
mounting location?

What are the desired timing sources?

Node Summary

Worksheets

Node Summary Worksheets define the Access System 2000 node’s
operating parameters (ID number, node name, location, query, and
alarm paths, etc.).

SNMP Node

Planning

Worksheet

This information is required for an AS2000 system using SNMP
management (does not apply to NCC nodes).

Table 3-4

provides an

example of how an SNMP node planning worksheet is filled out.