Commissioning

NOTICE!

Commissioning should only be performed and

documented by specially trained personnel.

Observe the operating manual for the indoor

units and outdoor components when commis-

sioning the entire system.

Once all the components have been connected

and tested, the system can be put into operation. A

functional check should be performed to verify its

correct function and identify any unusual operating

behaviour prior to handing it over to the operator.

Function test of heating operating mode

1.

Remove the protective caps from the valves.

2.

Start the commissioning procedure by briefly

opening the shut-off valves on the indoor unit

until the pressure gauge indicates a pressure

of approx. 2 bar.

3.

Check all connections for leaks with leak

detection spray and suitable leak detectors. If

no leaks are found, fully open the shut-off

valves by turning them anti-clockwise with

the cap of the valve. If leaks are found, draw

off the refrigerant and rework the defective

connection. It is imperative that the vacuum

creation and drying steps are repeated!

4.

Activate the main circuit breaker or fuse (to

be provided by the customer).

5.

Program the Smart-Control (see the relevant

instructions).

6.

Switching on heating mode.

Due to the turn on delay, the compressor

will start up a few minutes later.

7.

Check all regulating, control and safety

devices for function and correct adjustment

during the test run.

8.

Measure all cooling data and record the

measured values in the commissioning

report.

9.

Remove the pressure gauge.

Functional checks and test run

Check the following points:

n

Leak-tightness of the refrigerant piping.

n

Compressor and fan running smoothly.

n

Issue of warmer water in the indoor module

and issue of cold air to outside module during

heating operation.

n

Function test of the indoor unit and all program

sequences.

n

Check of the surface temperature of the suc-

tion pipe and that the vaporiser is not over-

heating. To measure the temperature, hold the

thermometer to the suction pipe and subtract

the boiling point temperature reading on the

pressure gauge from the measured tempera-

ture.

n

Record the measured temperatures in the

commissioning report.

Final tasks

n

Use the Smart-Control to set the target temper-

ature to the required value.

n

Re-install all disassembled parts.

n

Familiarise the operator with the system.

NOTICE!

Check that the shut-off valves and valve caps

are tight after carrying out any work on the

cooling cycle. Use appropriate sealant prod-

ucts as necessary.

Adding refrigerant

DANGER!

The connection of refrigerant pipes and the

handling of refrigerant may be only be carried

out by qualified personnel (competence cate-

gory I).

DANGER!

Only refrigerant in a liquid state may be used to

fill the cooling cycle!