Installing the Pulser Kit in Twin Units (Kits M06245K001 through M06245K003 and M06245K008)
Page 14
MDE-4506A Atlas™ Pulser Kits M06245K0XX Installation · May 2006
Testing/Checking Operation
Only the 10:1 pulser can be tested for operation. Using test equipment, others must be tested
when hooked to the pump/dispenser controller. Test the 10:1 pulser as follows:
1
Inform the manager/owner that power will be restored to the unit and then restore power to the
unit.
2
Connect a mechanical voltmeter on the two orange signal wires.
3
Set the voltmeter to read Ohms.
4
Slowly dispense fuel and observe that the needle deflects upscale for each 1/10 gallon fuel.
Completing the Installation
1
After determining that the pulsers are functioning properly, remount the dial faces on the two
computers and secure with the screws saved during removal.
2
Remount the bezels on both sides of the unit and secure with the screws saved during removal.
3
Remount the doors on both sides of the unit and secure with the keylocks.
4
Inform the manager/owner that the unit can be returned to service.