Crank case breather and p, Crank case breather and pcv installation – Paxton Superchargers Shelby Mustang GT User Manual
Page 49

P/N: 4809660
©2007 Paxton Automotive
All Rights Reserved, Intl. Copr. Secured
27FEB07 v1.0 05-07ShelbyMusGT(4809660v4.0)
37
Fig. 9-a
Fig. 9-b
Fig. 9-c
9.
CRANK CASE BREATHER AND PCV INSTALLATION
A.
Locate PVC/MAF assembly 4FU139-096.
B.
Locate the factory 5/8" x 90° hose end connector
removed in a previous step. Cut two pieces of the
supplied 5/8"ID hose approximately 3" long.
Connect one hose to the 90° fitting.
C.
Install the supplied PCV valve into the 5/8" hose.
D
.
Cut a piece of the supplied 3/8"ID hose 5" long
and connect to the previously installed PCV valve.
E.
Install the supplied 3/8" to 5/8" hose union to the
open end of the 3/8" hose. Connect the second
5/8" x 3" hose to the hose union.
F.
Install the hose assembly between the driver’s
side valve cover and the intake manifold. Secure
hose connections as necessary using the supplied
hose clamps. (See Figs. 9-a,
9-b for assistance.)
G.
Locate the factory 3/8" x 90° fitting removed
from the passenger’s side valve cover in a previ-
ous step.
H.
Connect the remainder of the supplied 3/8"ID
hose to the 90° fitting and connect to the passen-
ger’s side valve cover. (See Fig. 9-c.)
I.
Route the open end of the 3/8" hose behind the
alternator and across to where the air inlet duct
will be located.
3/8" TO 5/8"
REDUCER UNION
SUPPLIED PCV VALVE
CONNECTION ON
PASSENGER’S SIDE
FACTORY 90° HOSE CONNECTOR
3/8" TO 5/8" UNION
FACTORY 90° HOSE CONNECTOR
FACTORY 90° HOSE CONNECTOR
SUPPLIED PCV VALVE