beautypg.com

2 • operation, Setting the envelope feeder, Setting the insert feeder – Pitney Bowes DI425 FastPac Inserting Systems User Manual

Page 22

background image

2 • Operation

2-6

SV61656 Rev. A

Setting the Envelope Feeder

The envelope feeder feeds the outer envelope for the inserting job

you’re running.
1. Adjust the side guides to the

width of the envelopes you’re

running, then back off half a

turn on the side guide control.

This sets the correct clear-

ance between the guides and

the envelopes.

2. Aerate (fan) the stack of en-

velopes you’re running.

3. Place envelopes on the feed

deck with their flaps up and

trailing.

IMPORTANT ! Check that

lead edge of the first enve-

lope is under the front feed

roller and that the stack of

envelopes is shingled on the

deck as shown.

Let the wedge slide down

behind the stack so that the

envelopes are supported.

Setting the Insert Feeder

1. Adjust the side guides to the

width of the material being

fed, then back off a quar-

ter turn on the side guide

control. This sets the cor-

rect clearance between the

guides and the material.